Decided to start this now as the parts are rolling in. I have two different projects that will be going on over the winter, one is a rather "simple", quicker project and one is probably going to take 4-6 months. These are the projects I have PROMISED myself that I AM going to finish.
The first is the RX7 again. I ditched the nitrous stuff and am going to be turboing it. Nothing extremely crazy, MasterPower 70mm turbo, 10-12 psi, planning to break the block in two at some point. going with a DIY blow-thru carb setup using the hangar18 guide. Completely stock longblock, single plane hi-rise intake.
The second is my '73 Mach One. First and foremost, I am doing the floor pans and the trunk pan. I could get away with patch panels as there is only a few rough spots but I'd rather do the full length floors and be done with it. trunk pan is fine really, just dented/scraped so I figured I might as well get it done too. Also got a new, complete vehicle wiring harness, all new black interior, paint is going to be semi-gloss black for now.
I am putting the 460/C6 in there from my fox body for the time being, an 8.8" disc rearend, very small "mini-tub", 17x9/10.5 bullets, 325's out back. haven't decided 100% on the suspension yet but I will be getting rid of the "tug boat" look and it will have a little forward rake to it.